CORRECTED: NASA's GRAIL Moon Twins are Joined to Their Booster

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Title: NASA's GRAIL Moon Twins are Joined to Their Booster
JPL/NASA News

News release: 2011-257                                                                     Aug. 18, 2011

NASA's GRAIL Moon Twins are Joined to Their Booster

NOTE: Includes corrected launch vehicle name and date/timing information.

The full version of this story with accompanying images is at:
http://www.jpl.nasa.gov/news/news.cfm?release=2011-257&cid=release_2011-257

CAPE CANAVERAL, Fla. -- NASA's lunar-bound GRAIL twins were mated to their Delta II launch vehicle at the Cape Canaveral Air Force Station's Launch Complex 17 at 8:45 a.m. EDT (5:45 a.m. PDT) today. The 15-mile (25-kilometer) trip from Astrotech Space Operations in Titusville, Fla., is the last move for GRAIL before it begins its journey to the moon. NASA's dynamic duo will orbit the moon to determine the structure of the lunar interior from crust to core and to advance understanding of the thermal evolution of the moon.

"We are about to finish one chapter in the GRAIL story and open another," said Maria Zuber, GRAIL's principal investigator, based at the Massachusetts Institute of Technology in Cambridge. "Let me assure you this one is a real page-turner. GRAIL will rewrite the book on the formation of the moon and the beginning of us."

Now that the GRAIL spacecraft are atop their rocket, a final flurry of checks and tests can begin to confirm that all is go for launch. The final series of checks begins tomorrow, Aug. 19, with an on-pad functional test. The test is designed to confirm that the spacecraft is healthy after the fueling and transport operations. Next week, among all the upcoming final tests, reviews and closeout operations leading up to liftoff, the GRAIL team will install the launch vehicle fairing around the spacecraft.

GRAIL's launch period opens Sept. 8 and extends through Oct. 19. On each day, there are two separate instantaneous launch opportunities separated in time by approximately 39 minutes. On Sept. 8, the first launch opportunity is at 8:37 a.m. EDT (5:37 a.m. PDT). The second launch opportunity is 9:16 a.m. EDT (6:16 a.m. PDT).

NASA's Jet Propulsion Laboratory, Pasadena, Calif., manages the GRAIL mission. The Massachusetts Institute of Technology, Cambridge, is home to the mission's principal investigator, Maria Zuber. The GRAIL mission is part of the Discovery Program managed at NASA's Marshall Space Flight Center in Huntsville, Ala. Lockheed Martin Space Systems, Denver, built the spacecraft. Launch management for the mission is the responsibility of NASA's Launch Services Program at the Kennedy Space Center in Florida. JPL is a division of the California Institute of Technology in Pasadena.

More information about GRAIL is online at: http://www.nasa.gov/grail .

DC Agle 818-393-9011
Jet Propulsion Laboratory, Pasadena, Calif.
agle@xxxxxxxxxxxx

Dwayne Brown 202-358-1726
Headquarters, Washington
Dwayne.c.brown@xxxxxxxx

Tracy Young 321-867-9284
Kennedy Space Center, Fla.
tracy.g.young@xxxxxxxx

2011-257


- end -


[Index of Archives]     [NASA News]     [Cassini]     [JPL Home]     [NASA KSC]     [NTSB]     [Yosemite News]     [NSF]     [Telescopes]

  Powered by Linux